Measurement & Verification (IPMVP)

A saving becomes real only after it survives measurement and verification.

  • Clause 9.1 Monitoring, measurement, analysis and evaluation
  • Clause 6.5 Energy baseline(s)
  • Clause 6.4 Energy performance indicators

A saving claimed without measurement and verification is an opinion, not a result. This module implements IPMVP Options A through D end to end: for each energy conservation measure, the appropriate option — retrofit isolation, whole-facility or calibrated simulation — is selected and an M&V plan is documented, covering measurement boundary, baseline period, adjustment method and reporting frequency in a structure aligned with ISO 50015. Routine adjustments are applied automatically from relevant-variable data, while non-routine adjustments — equipment changes, expansions, closures — are logged with full justification and supporting evidence. Avoided energy is calculated as baseline-predicted minus actual consumption and converted to avoided cost and avoided emissions, with the statistical uncertainty of every savings figure reported alongside the number itself.

IPMVP Option A/B/C/D configuration

Select the appropriate IPMVP option per measure — retrofit isolation, whole-facility or calibrated simulation — and configure the M&V plan accordingly.

ISO 50015-aligned M&V plans

Document the measurement boundary, baseline period, adjustment method and reporting frequency for each M&V plan in a structured, standardised template.

Routine and non-routine adjustments

Apply routine adjustments automatically from relevant-variable data and log non-routine adjustments with full justification and supporting evidence attached.

Avoided energy and cost

Calculate avoided energy as baseline-predicted minus actual consumption, then convert it to avoided cost and avoided emissions using current tariffs and factors.

Uncertainty reporting

Report the statistical uncertainty of every savings figure alongside the number itself, so stakeholders know exactly how much confidence it supports.

Per-measure verification reports

Generate a stand-alone verification report per energy conservation measure suitable for submission to a financier, an ESCO contract or a regulator.

Gita 50001 Energy Management Dashboard
Overview
Monitoring
EnPI
Actions
Reports
Site 1 — Production Line ALast 12 months
Live data
Baseline Periods202320242025

Monthly EnPI Table

PeriodActualBaselineEnPISavings
Jan482 MWh510 MWh0.955.5%
Feb465 MWh502 MWh0.937.4%
Mar490 MWh525 MWh0.936.7%
Apr518 MWh550 MWh0.945.8%
May530 MWh570 MWh0.937.0%
Jun498 MWh540 MWh0.927.8%

Actual consumption, baseline and energy performance indicator by month

Baseline Regression
Baseline Regression — Relationship between energy consumption and the primary relevant variable used to calculate the baseline020,00040,00060,00005001,000Production Output (tons)Energy Consumption (MWh)
Monthly data pointsFit lineR² = 0.94 0.99

Relationship between energy consumption and the primary relevant variable used to calculate the baseline

Baseline Regression
Production Output (tons)Energy Consumption (MWh)
82041,200
79539,900
86043,100
78039,400
91045,200
70536,800
94046,100
83041,800
76038,600
88543,900
81540,700
87542,950
R² = 0.940.99

Scroll to see more

The figures and charts shown on this website are illustrative sample data used to demonstrate the software's capabilities and do not reflect the actual performance of any organization.

  • Savings claims hold up under scrutiny from a financier, an ESCO or a regulator.

  • Non-routine adjustments are documented at the time they happen, not reconstructed later from memory.

  • Every savings figure carries an honest uncertainty range instead of false precision.

  • M&V plans are consistent across projects because they follow the same IPMVP structure.

  • ESCO and performance-contract savings are independently verifiable, protecting both sides of the contract.

  • M&V plan per energy conservation measure

  • Avoided energy, cost and emissions calculation

  • Savings verification report with uncertainty

  • Routine/non-routine adjustment log

Talk to an engineer about your specific modules

Not every plant needs all fifteen modules on day one. Tell us your priorities and we'll show you the modules that matter most for your ISO 50001 certification timeline.